Twin Falls GS – Exciter Upgrade
Location: Redlake, Ontario
Customer: Evolution Mining
Project Summary
Our Team provided upgrade services for the generator excitation systems at twin falls. This included detailed design, equipment procurement, settings development, on-site support, and full system commissioning to ensure reliable and stable generator operation. The scope of work included:
- Performed the detailed design for the generator excitation system upgrades.
- Procured all required materials.
- Developed the DECS-250 exciter settings.
- Provided on-site construction support.
- Performed full commissioning of the new excitation systems and provided startup support.