New Gold â Rainy River Mine Power System Study
Location: Rainy River, Ontario
Customer: New Gold Inc.
Project Summary
Our team conducted a comprehensive power system study for the mine site's electrical distribution system, spanning from the 230kV level down to the 600/347âŻV distribution. The scope of work included:
- A detailed on-site data collection to gather the required information to model the Rainy River Mine electrical system from the 230kV level down to the 600/347V level.
 - Protective device coordination study
- Analyzed existing overcurrent protection settings and compared against industry best practices and applicable standards for protection systems.
 - Provided recommended overcurrent settings for the protective devices based on the applicable industry standards and best practices (e.g., OESC, IEEE/CSA, etc.).
 - Provided existing and recommended time current curves (TCCs).
 - Provide existing and recommended overcurrent protection settings in a tabular format.
 
 - Arc flash incident energy analysis  
- Performed an arc flash incident energy analysis as per CSA Z462 and IEEE 1584 for the electrical distribution down to the 600/347V level.
 - Provided a list of recommended settings to reduce incident energy levels below 12 cal/cm2.
 - Installed arc flash adhesive warning labels.